A sample listing of our projects in the Commercial area:

 
 
Job: Bristol Myers Squibb - Guard Shelter
Client: J.M. Coull
Job Location: Billerica
Description:
Clearing, grubbing, and erosion control.
Installation of temporary access driveway.
5,000 CY cut and export of new parking lot.
Installation of water and sewer services.
Installed paving and curbing.
Job:
Station Landing
View Project Image View Project Image View Project Image

View Project Image View Project Image View Project Image
View Project Image View Project Image View Project Image

Client: Cranshaw Construction
Job Location: Medford
Description:
Installation of erosion control.
Site demolition including paving, utilities, concrete slabs, foundations, and caissons.
100,000 CY mass excavation for 2 EA buildings.
Transported and disposed of 150,000 TON of regulated soils.
Design and installation of steel sheetpile system to support an existing 30" gas main.
Design and installation of H-beam and lagging system to support existing roadway.
Construction dewatering.
Groundwater treatment, including GAC's and ion exchangers.
Foundation preparation for 2 EA building having a total footprint area of over 130,000 SF.
Installation of water, sewer, and drainge systems.
Installed paving and curbing.
Design and installation of H-beam and lagging excavation support system for cuts up to 25 feet deep.
Design and installation of underpinning system up to 10 feet below existing footings.
5,000 CY mass excavation for underground addition and place on-site.
Construction dewatering.
Installation of water and sewer services.
Installation of Versa Lok retaining walls up to 6 feet high.
Installation of atheltic field underdrainage system.
Job: Fan Pier Harborwalk
Client: Spaulding & Slye
Job Location: Boston
Description:
Grade and pave walkway.
Installed timber curbing along walkway.
Job:
Harrison Commons
View Project Image View Project Image View Project Image

View Project Image View Project Image View Project Image

   
View Project Image    

 

Client: R.F. Walsh
Job Location: Boston
Description:
33,000 CY mass excavation for underground parking structure.
Design and installation of sheetpile cofferdam which supported excavations up to 32 feet deep.
Construction dewatering.
Transported and disposed of 50,000 TON of regulated and unregulated soils.
On-site treatment of lead contaminated soils.
Installed water and sewer services.
Installed site drainage.
Prepared sidewalk subgrades and installed granite curbing.
Job: Biosquare Building "D"
 
View Project Image View Project Image  
Client: Spaulding & Slye
Job Location:
Boston
Description: Removal of existing pile foundations which required excavations up to 30 feet deep.
Excavation and backfill of pile caps and grade beams.
Transported and dispose of 5,000 TON of regulated soils.
Installed water, sewer, and drainage piping.
Installed paving and curbing.
Job:

Burlington Office Park Subdivision Road

Client: Gutierrez Construction
Job Location: Burlington
Description:
Clearing, grubbing, and erosion control.
Construction of 1,200 LF commerical subdivision road.
Drilling and blasting of 2,500 CY of ledge.
Installation water, sewer, and drainage systems.
Installed paving and curbing.
Job: Rangeway Mini Storage
Client: R.J. Kelly Company
Job Location: Billerica
Description:
Clearing, grubbing, and erosion control for 10 AC site.
Drilled, blasted, and crushed 15,000 CY of ledge
Foundation preparation of 8 EA storage buildings
Installed water and drainage piping.
Installed Versa Lok retaining walls up to 8 feet high
Installed paving and curbing.
Job:
55 Lyman Street Warehouse
View Project Image View Project Image View Project Image

View Project Image View Project Image View Project Image


Client: Gutierrez Construction
Job Location: Northboro
Description:
Clearing, grubbing, and erosion control for 12 AC site.
Completed 70,000 CY cut to fill in 3 weeks.
Foundation preparation for 150,000 SF building footprint.
Installed water, sewer, and drainage piping.
Installed pressure dosing septic system with 15,000 gallon septic tank.
Job: 4th Avenue Parking Lot Expansion
Client: Spaulding & Slye Construction
Job Location: Waltham
Description:
Import and place 10,000 CY of common fill.
Installed Versa Lok retaining walls up to 25 feet high.
Installed drainage and underground detention system.
Installed paving and precast concrete curbing.
Job:

Overlook Ridge Force Main & Pumping Station

View Project Image View Project Image View Project Image

 
View Project Image View Project Image  
Client: Roseland Contractors LLC
Job Location: Revere/Malden
Description:
Installation of 6,000 LF of 10" sewer force in city streets.
Installed sewer pump station within a braced excavation.
Pipe jacked 10" sewer main across active Route 1 exit ramp.
 
 
 

Copyright © 2006.
W.L. French Excavating Corporation
All Rights Reserved


Home | Services | Safety | Portfolio | Equipment | About Us
Contact | Directions | Privacy Policy | Site Map

A website designed and maintained by Modern Creative