A sample listing of our projects in the Commercial area:
|
|
| |
| Job: |
Bristol Myers Squibb - Guard Shelter |
| Client: |
J.M. Coull |
| Job Location: |
Billerica
|
| Description: |
Clearing, grubbing, and erosion control.
|
| Installation of temporary access driveway. |
| 5,000 CY cut and export of new parking lot. |
| Installation of water and sewer services. |
| Installed paving and curbing. |
|
| Job: |
| Station Landing |
 |
 |
 |
| View Project Image |
View Project Image |
View Project Image |

|
 |
 |
| View Project Image |
View Project Image |
View Project Image |
 |
 |
 |
| View Project Image |
View Project Image |
View Project Image |
|
|
| Client: |
Cranshaw Construction |
| Job Location: |
Medford |
| Description: |
Installation of erosion control.
|
| Site demolition including paving, utilities, concrete slabs, foundations, and caissons. |
| 100,000 CY mass excavation for 2 EA buildings. |
| Transported and disposed of 150,000 TON of regulated soils. |
| Design and installation of steel sheetpile system to support an existing 30" gas main. |
| Design and installation of H-beam and lagging system to support existing roadway. |
| Construction dewatering. |
| Groundwater treatment, including GAC's and ion exchangers. |
| Foundation preparation for 2 EA building having a total footprint area of over 130,000 SF. |
| Installation of water, sewer, and drainge systems. |
| Installed paving and curbing. |
| Design and installation of H-beam and lagging excavation support system for cuts up to 25 feet deep. |
| Design and installation of underpinning system up to 10 feet below existing footings. |
| 5,000 CY mass excavation for underground addition and place on-site. |
| Construction dewatering. |
| Installation of water and sewer services. |
| Installation of Versa Lok retaining walls up to 6 feet high. |
| Installation of atheltic field underdrainage system. |
|
| Job: |
Fan Pier Harborwalk |
| Client: |
Spaulding & Slye |
| Job Location: |
Boston |
| Description: |
Grade and pave walkway. |
| Installed timber curbing along walkway. |
|
|
| Job: |
Biosquare Building "D"
 |
 |
|
| View Project Image |
View Project Image |
|
|
| Client: |
Spaulding & Slye |
| Job Location: |
Boston
|
| Description: |
Removal of existing pile foundations which required excavations up to 30 feet deep. |
| Excavation and backfill of pile caps and grade beams. |
| Transported and dispose of 5,000 TON of regulated soils. |
| Installed water, sewer, and drainage piping. |
| Installed paving and curbing. |
|
| Job: |
Burlington Office Park Subdivision Road |
| Client: |
Gutierrez Construction |
| Job
Location: |
Burlington |
| Description: |
Clearing, grubbing, and erosion control. |
| Construction of 1,200 LF commerical subdivision road. |
| Drilling and blasting of 2,500 CY of ledge. |
| Installation water, sewer, and drainage systems. |
| Installed paving and curbing. |
|
| Job: |
Rangeway Mini Storage |
| Client: |
R.J. Kelly Company |
| Job Location: |
Billerica |
| Description: |
Clearing, grubbing, and erosion control for 10 AC site. |
| Drilled, blasted, and crushed 15,000 CY of ledge |
| Foundation preparation of 8 EA storage buildings |
| Installed water and drainage piping. |
| Installed Versa Lok retaining walls up to 8 feet high |
| Installed paving and curbing. |
|
|
| Job: |
4th Avenue Parking Lot Expansion |
| Client: |
Spaulding & Slye Construction |
| Job Location: |
Waltham
|
| Description: |
Import and place 10,000 CY of common fill. |
| Installed Versa Lok retaining walls up to 25 feet high. |
| Installed drainage and underground detention system. |
| Installed paving and precast concrete curbing. |
|
| Job: |
|
| Client: |
Roseland Contractors LLC |
| Job Location: |
Revere/Malden |
| Description: |
Installation of 6,000 LF of 10" sewer force in city streets. |
| Installed sewer pump station within a braced excavation. |
| Pipe jacked 10" sewer main across active Route 1 exit ramp. |
|
|
|
| |
| |
|